Evergreen Brick Works Helps Usher In Cycling Infrastructure on Bayview

Don Valley Brick Works - Toronto, Ontario, Canada

Evergreen Brick Works recently held their grand opening, and while events and a market have been held at the site all summer, access by bicycle has been somewhat limited.

Bayview, a street where the speed limit increases to 70 km/h (meaning 90 km/h to far too many drivers) in front of the Brick Works also has crumbling shoulders. Certainly an uninviting situation for anyone on two wheels.

However, the revitalization of the once abandoned site is bringing in cycling and pedestrian infrastructure. In an e-mail from Dave Dunn of Cycling Infrastructure and Programs for the City of Toronto he explained that a new bi-directional and physically separated multi-use path will now connect the Rosedale Valley Drive multi-use trail to the Brick Works site. As well, a connection to Pottery Road will allow cyclists and pedestrians to access the site from the Lower Don Trail.

For added safety, Jersey barriers will be installed along Bayview separating cycling and pedestrian traffic, and the wooden bridge that runs under the Bayview access to the Don Valley Parkway is being repaired.

Here’s a Google Map created by Christina Bouchard detailing the changes currently being installed along Bayview (click for more details):

Photo via Flickr

Comments

  1. In terms of its several functions, remember that septic
    and the standard sewage system have distinctive differences that make the previous
    a much-preferred system.

  2. Provided here is the link for the application, application guidelines
    and also list that has to be sent for testimonial and approval to Ohio Division of Health to show that all
    the requirements for septic systems described in chapter 3701-29-12 have actually been met.

  3. Amazing! Its in fact amazing post, I have got much clear idea on the topic of from this piece of writing.

Speak Your Mind

*