Learn more about BikingToronto and Singer Kwinter

INFRASTRUCTURE: Cyclists eager to extend trips downtown on the West Toronto Railpath

The 3.5-metre-wide cycling and pedestrian path currently runs for two kilometres along the railway corridor, roughly following Dundas Street West, from Dupont Street in the north to near College Street in the south. Now, six years after the first leg opened, cyclists were eager to hear about the three-kilometre extension that will take the mostly off-road path deep into the city to Stanley Park near Strachan Avenue and Wellington Street West, even though work won’t start until 2016.

Read More: Cyclists eager to extend trips downtown on the West Toronto Railpath – The Globe and Mail.


comments powered by Disqus


RECENT NEWS POSTS:



RECENT INFRASTRUCTURE POSTS: