Learn more about BikingToronto and Singer Kwinter

PUBLIC MEETING: June 26 – West Toronto Railpath Extension EA Study

Date: Wednesday, June 26, 2013

Time: 5:30 p.m. to 8:30 p.m.

Location: New Horizons Tower, 1140 Bloor St. W. (at Dufferin St.)

Background

In this study we will determine the preferred route for extending the West Toronto Railpath from the Dundas Street West overpass (at Sterling Road), along the Georgetown GO rail corridor, to Strachan Avenue and the planned Fort York Pedestrian & Cycle Bridge. The study will develop a continuous multi-use trail and identify connections to surrounding communities.

For more information; www.toronto.ca/westrailpath

(photo by Amy Cooney)

Upcoming Events on the BikeEvents.TO calendar

Sign up for the Biking Toronto Newsletter

Don't have time to check for blog posts here? Get new blog posts in your email! One email per day, max!






Popular Posts Today

  • EVENT: RedBull Race The Place ... Mystery
  • EVENT: Sat. April 19 - Red Bull "Race the Place" hits Ontario Place!
  • PHOTO OF THE DAY: On the phone...
  • PHOTO OF THE DAY: Cyclist in Toronto
  • Bikelane Map
  • STUFF: TiGr Lock Review - Momentum Mag
  • STUFF: Cleverhood: cycling in the rain and in style
  • STUFF: 4th Annual Gear Guide Preview: City Bikes - Momentum Mag



  • Popular Posts This Month

  • EVENT: Sat. April 19 - Red Bull "Race the Place" hits Ontario Place!
  • Bikelane Map
  • EVENT: RedBull Race The Place ... Mystery
  • NEWS: Separated Bike Lanes are coming to Eglinton!
  • BlogTO compiles the Best Used Bike Shops in Toronto
  • Celebrate Spring I Bike T.O. Shirt Sale!
  • NEWS: Bixi gets new name, operator, prices
  • NEWS: Cyclist killed in collision with transport truck